Assembly
|
Ranbuild sheds come complete with Slab Plans, Bill of Materials, Steel Marking Plans and an Erection Manual. The included documentation makes construction of your Ranbuild Shed simple. Your local Accredited Ranbuild Dealer can also arrange the construction of your shed by licensed contractors.
Slab Plan
|
|
Bill of Materials (BOM)
The BOM document contains a list of all the components that make up the building.
All building component quantities should be checked against the BOM as soon as possible after delivery and before commencing any assembly work. No damage or shortage claims will be accepted later than 14 days from the delivery date.
The BOM also gives sizes for many components to help identify them. This can be useful when sorting and preparing items prior to construction.
Erection Manuals
Every Ranbuild garage or shed comes with a 60 page, fully illustrated and detailed erection manual. It covers everything from laying out to finishing off and includes drawings on where items belong and how they fit together. |
The slab plan is critical and the only document to be used for setting out the holding down bolts or straps and concrete formwork. All dimensions are shown as well as bolt or strap orientation, centre lines, door set-downs and other important information. The slab plan must be read in conjunction with the Ranbuild erection manual. |
| |
The steel marking plan shows the location of steel members, cleats and cladding materials. Steel marking plans may be a single page or a multiple page document. Steel marking plans must be read in conjunction with the Ranbuild erection manual. |
|
|